Engineering, Procurement and Construction |
|
| Project |
: |
Brand New Diesel Engine Driven Fire Pump including Pump House and Standard accessories |
| Client |
: |
APO Cement Cebu Corporation |
| Owner |
: |
CEMEX Philippines |
| Location |
: |
Brgy. Tina-An, Naga, Cebu |
| Year Completed |
: |
March 2009 |
| Project |
: |
Foam Extinguishing System at APO Cement-Fuel Storage
Tank near Pier |
| Client |
: |
APO Cement Cebu Corporation |
| Owner |
: |
CEMEX Philippines |
| Location |
: |
Brgy Tina-An, Naga, Cebu |
| Year Completed |
: |
January 2009 |
| Project |
: |
“ESFR” Automatic Fire Sprinkler System for LTP Tire Storage Building |
| Client |
: |
Lufthansa Technik Philippines, Inc. |
| Owner |
: |
Lufthansa Technik Philippines, Inc. |
| Location |
: |
MacroAsia Ecozone, Villamor Airbase, Pasay City |
| Year Completed |
: |
July 2008 |
| Project |
: |
Pre-Action Sprinkler System for Sun Power Manufacturing Co. Ltd.Expansion Project |
| Client |
: |
Sumisetsu Philippines, Inc. |
| Owner |
: |
Sun Power Manufacturing Co. Ltd. |
| Location |
: |
Laguna Techno Park, Biñan, Laguna, Philippines |
| Year Completed |
: |
July 2008 |
| Scope of Work |
: |
Engineering, Procurement and Construction of the Proposed Pre-Action Sprinkler System for UPS and LVSG Room, UPS Room and IDF Room in accordance with FM GLOBAL standards
|
| Project |
: |
Rehabilitation of Fire Pump and Additional Automatic Fire Sprinkler System |
| Client |
: |
Honda Cars Philippines, Inc. |
| Owner |
: |
Honda Cars Philippines, Inc. |
| Location |
: |
Laguna Techno Park, Biñan, Laguna, Philippines |
| Year Completed |
: |
June 2008 |
| Scope of Work |
: |
Rehabilitation of Fire Pump and Additional Automatic Fire Sprinkler System at Honda Cars Philippines, Inc. located at the Laguna Techno Park, Biñan, Laguna, Philippines |
| Project |
: |
Automatic Fire Sprinkler System for the New Offices at Hangar Bay 5 |
| Client |
: |
Lufthansa Technik Philippines, Inc. |
| Owner |
: |
Lufthansa Technik Philippines, Inc. |
| Location |
: |
MacroAsia Ecozone, Villamor Airbase, Pasay City |
| Year Completed |
: |
May 2008 |
| Project |
: |
Fire Protection System, Fire Detection and Alarm System for the New Wide Body Aircraft Hangar at Lufthansa Technik Philippines |
| Client |
: |
Lufthansa Technik Philippines, Inc. |
| Location |
: |
MacroAsia Ecozone, Villamor Airbase, Pasay City |
| Year Completed |
: |
April 2008 |
| Scope of Work |
: |
Engineering, Procurement and Construction of the Proposed Fire Protection System at the New Wide Body Aircraft Hangar at Lufthansa Technik Philippines, Inc.
AFSS was awarded the complete Engineering, Procurement and Construction of the Proposed Fire Protection System for the New Wide Body Aircraft Hangar (98x87meters) at Lufthansa Technik Philippines, Inc. in accordance with NFPA 409 “Standard for Aircraft Hangar”
.
Our scope of work includes the protection of 1-Boeing 747-800/777-
300ER or 1-Airbus 340-600. Listed are the fire protection systems to be
installed at the New Wide Body Hangar:
|
PRIMARY PROTECTION
Low Level, Low Expansion AFFF Foam Extinguishing System
6-Units of Oscillating Monitors rated at 1500GPM at 100psi
4-Units of Foam/Water Hose Reels rated at 85GPM at 100psi |
|
SECONDARY PROTECTION
Overhead Wet Type Automatic Fire Sprinkler System
725 Upright Sprinkler Heads at K8.1, 175deg F covering the entire
Hangar Floor Area |
|
MAIN SUPPLY PIPELINE
230 Meters of 18 inch diameter Schedule 40 Spiral Pipe tapped to
the existing fire protection system and driven by 6-units of
2500GPM Vertical Turbine Fire Pumps with 1.3Million Gallons of
dedicated Water Supply |
|
 |
| Project |
: |
Foam Extinguishing System at APO Cement-Fuel Storage Tank for 66MW Power Plant |
| Client |
: |
APO Cement Cebu Corporation |
| Owner |
: |
CEMEX Philippines |
| Location |
: |
Brgy Tina-An, Naga, Cebu |
| Year Completed |
: |
January 2008 |
| Scope of Work |
: |
Engineering, Procurement and Construction of the Proposed Foam Extinguishing System
AFSS was awarded the complete Engineering, Procurement and Construction of the Integrated Fire Protection System of APO Cement, Cebu to protect their existing Fuel Tank Storage for the 66MW Diesel Fuel Power Plant located at Brgy., Tina-An, Naga Cebu. AFSS shall design, install, test and commission the following systems:
|
| Project |
: |
Additional Automatic Fire Sprinkler System at Honda Cars Philippines, Inc. Manufacturing Plant |
| Client |
: |
Honda Cars Philippines, Inc. |
| Owner |
: |
Honda Cars Philippines, Inc. |
| Location |
: |
Laguna Techno Park, Biñan, Laguna, Philippines |
| Year Completed |
: |
January 2008 |
| Scope of Work |
: |
Engineering, Procurement and Construction of the Proposed Additional Automatic Fire Sprinkler System at Honda Cars Philippines, Inc. located at the Laguna Techno Park, Biñan, Laguna,
Philippines
AFSS was awarded the complete Engineering, Procurement and Construction of Additional Wet Type Fire Sprinkler System at Honda Cars Philippines, Inc. The additional sprinkler system shall be designed to
protect various types of Paint Spray Booth, Manufacturing Offices, Spare Parts Storage and Production Line. |
| Project |
: |
Fire Protection System at Lemon Square Manufacturing Plant |
| Client |
: |
Big E Food Corporation |
| Location |
: |
91 Sampaloc Street, Bgy. Libtong, Meycauayan, Bulacan |
| Year Completed |
: |
November 2007 |
| Scope of Work |
: |
Engineering, Procurement and Construction of the Proposed Fire Protection System at Lemon Square Manufacturing Plant
AFSS was awarded the complete Engineering, Procurement and Construction of the Proposed Fire Protection System at Lemon Square Manufacturing Plant located at Bgy. Libtong, Meycauyan, Bulacan. Our scope of work includes the protection of Rack Storage Warehouse Building, Production Building and other auxiliary buildings. Listed are the fire protection systems to be installed at Lemon Square plant, as follows:
| A. |
Fire Pump and Jockey Pump System |
| B. |
Fire Main and Accessories |
| C. |
Ceiling Fire Sprinkler System |
| D. |
In-Rack Fire Sprinkler System |
| E. |
Fire Detection and Alarm System |
| F. |
Sprinkler Alarm System |
|
Procurement and Construction |
|
| Project |
: |
Pre-Action Sprinkler System for Convergys Cebu i3 Project |
| Project Manager |
: |
Jones Lang LaSalle |
| Engineers |
: |
Meinhardt Philippines |
| Owner |
: |
Convergys Philippines Service Corporation |
| Location |
: |
Asia Town Business Park, Lahug, Cebu City |
| Year Completed |
: |
July 2008 |
| Scope of Work |
: |
Procurement and Construction of the Proposed Pre-Action Sprinkler System for Convergys Cebu i3 Project
| A. |
INBAL
Double Interlock, Pre-Action Sprinkler System complete
With Standard Accessories and trims |
|
| Project |
: |
Pre-Action Sprinkler System for Convergys Bacolod BTS Project |
| Project Manager |
: |
Jones Lang LaSalle |
| Engineers |
: |
Meinhardt Philippines |
| Owner |
: |
Convergys Philippines Service Corporation |
| Location |
: |
One SanParq Square, Lacson St., Mandalagan, Bacolod City |
| Year Completed |
: |
May 2008 |
| Scope of Work |
: |
Procurement and Construction of the Proposed Pre-Action Sprinkler System for Convergys Bacolod BTS Project
| A. |
INBAL
Double Interlock, Pre-Action Sprinkler System complete with standard accessories and trims |
|
Procurement and Delivery |
|
| Project |
: |
Supply and Delivery of Factory Mutual Approved Fire Rated Glass |
| Client |
: |
APO Cement Corporation |
| Location |
: |
APO Cement Corporation-Brgy. Tina-An, Cebu |
| Year Completed |
: |
August 2007 |
| Scope of Work |
: |
Factory Mutual SAI 07-37661 Purchase of 20pcs cut size 0.93m x0.90m dimension Superlite I-W ¼” MISCO Diamond Wired Glass 60
Minutes fire rated as labeled by Warnock Hersey Meeting Safety Standards CPSC 16 CFR CAT II
AFSS was awarded the complete supply and delivery to Naga, Cebu 20 pieces of fire rated glass. AFSS was the only vendor in the Philippines who was pre-qualified by FM Global and APO Cement to supply and
deliver a 60 minute fire rating glass to be installed at APO Cement Power Plant. |
Rehabilitation and Project Engineering |
|
| Project |
: |
Rehabilitation of Fire Pump System and Controllers |
| Owner |
: |
Novartis Philippines, Inc. |
| Client |
: |
Asian Reassurance Condominium Corporation thru Global Technology and Systems Philippines, Inc. |
| Location |
: |
Legaspi Village, Makati City |
| Year Completed |
: |
June 2006 |
| Scope of Work |
: |
Rehabilitation of Fire Pump and Jockey Pump System and Replacement of domestic Water Supply Controller
AFSS was awarded the complete rehabilitation and restoration of Fire Pump and Jockey Pump System for ARCC Building including the replacement of Domestic Water Pump controller. ARCC Condominium Building is the Manila office of Novartis Philippines . AFS was responsible for the following fields: Fire Protection, Domestic Water Supply and the affected Civil, Architectural, Mechanical, Electrical and
Auxiliary systems. |
Sprinkler Renovation |
|
| Project |
: |
Renovation of Automatic Fire Sprinkler System at the 54th and 55th Floors, Penthouse Unit, Pacific Plaza South Tower, Fort Bonifacio
Global City, Taguig. |
| Owner |
: |
Mr. and Mrs. Pascua |
| Client |
: |
Integrated Network Construction Services, Inc. |
| Location |
: |
Pacific Plaza Twin Towers, Fort Bonifacio Global City, Taguig |
| Year Completed |
: |
May 2004 |
| Scope of Work |
: |
Fire Protection
AFSS was awarded the complete installation of Automatic Fire Sprinkler System at the Penthouse Unit, 54 and 55 floors at the South Tower,th Pacific Plaza. Works include the provision for new automatic fire sprinkler system including testing and commissioning.
|
General Engineering and Building |
|
| Project |
: |
2-Storey, MM3 Office Building |
| Owner |
: |
Lufthansa Technik Philippines, Inc. |
| Client |
: |
RGA Solutions, Inc. |
| Location |
: |
LTP Technical Center, Villamor Air Base, Pasay City |
| Year Completed |
: |
March 2004 |
| Scope of Work |
: |
Site Development, Structural, Civil, Electrical, Mechanical, Interior Fit-out, Fire Protection and Auxiliary System
AFSS was awarded the complete construction of a brand new office
building with a total floor area of 355 square meters. Scope of Work
includes structural, civil, architectural and interior finishes, electrical and
mechanical works. |
Rehabilitation and Project Engineering |
|
| Project |
: |
Rehabilitation of Fire Hydrant System at Lufthansa Technik Philippines, Inc. |
| Owner |
: |
Lufthansa Technik Philippines, Inc. |
| Client |
: |
RGA Solutions, Inc. |
| Location |
: |
LTP Technical Center, Villamor Air Base, Pasay City |
| Year Completed |
: |
July 2003 |
| Scope of Work |
: |
Civil and Fire Protection
AFSS was awarded the complete rehabilitation of Fire Hydrant System at
LTP Technical Facility (formerly PAL Technical Center). The project
includes the installation of a 2.5 kilometer, 8” Fire Hydrant Pipe Line
including its accessories. The project was scheduled for completion in 6
months. AFS was successful in completing the job 15 calendar days ahead of time. This was due to its competence in planning and the execution of
various types of fabrication and installation techniques. |
Supply and Installation |
|
| Project |
: |
Waste Water Treatment Plant “Package 2” at Lufthansa Technik Philippines, Inc. |
| Owner |
: |
Lufthansa Technik Philippines, Inc. |
| Client |
: |
RGA Solutions, Inc. |
| Location |
: |
LTP Technical Center, Villamor Air Base, Pasay City |
| Year Completed |
: |
August 2003 |
| Scope of Work |
: |
Civil, Electrical and Mechanical
AFSS was awarded the complete supply and installation of Waste Water
Treatment Pipeline including the construction of a transfer tank and
accessories. The project was implemented together with the rehabilitation
of fire hydrant system at Lufthansa Technik Philippines.
|
| Project |
: |
GSE Wash Bay at Lufthansa Technik Philippines, Inc. |
| Owner |
: |
Lufthansa Technik Philippines, Inc. |
| Client |
: |
RGA Solutions, Inc |
| Location |
: |
LTP Technical Center, Villamor Air Base, Pasay City |
| Year Completed |
: |
September 2003 |
| Scope of Work |
: |
Civil, Electrical and Mechanical
AFSS was awarded the complete construction of the GSE-Wash Bay area.
Works include the excavation and disposal of debris, civil works
construction, electrical and mechanical works.
|
Renovation Works |
|
| Project |
: |
Renovation Works for Phase 5 and 6, Aircraft Overhaul Project |
| Owner |
: |
Lufthansa Technik Philippines, Inc. |
| Client |
: |
RGA Solutions, Inc. |
| Location |
: |
LTP Technical Center, Villamor Air Base, Pasay City |
| Year Completed |
: |
December 2003 |
| Scope of Work |
: |
Civil, Electrical, Mechanical and Fire Protection
AFSS was awarded the complete Renovation of Phase 5 and 6, Paint Shop - Aircraft Overhaul Project at Lufthansa Technik Philippines. The project includes the complete renovation of its existing Paint Shop which covers Phase 5 and 6 of the Aircraft Overhaul Project. Explosion Proof Electrical devices were used for this project. |
|